Build the shooting schedule

You can build the shooting schedule by placing scenes on shooting days and adding the breaks, moves, and meetings around them. Work in the calendar to see times at a glance, or in the list to order a day's work.

If the project has no board yet, click Create Board 1 on the Schedule page first.

Change the view

  1. In a project, click Schedule in the sidebar.
  2. Click Day, Week, Month, or List.
  3. In the Day, Week, or Month view, click or to move back or forward, or click Today to return to the current date.

In the Month view, click a date to open it in the Day view.

Schedule scenes from the list

The List view shows each shooting day with its events, and the Unscheduled scenes panel shows the scenes that aren't on any day yet.

  1. On the Schedule page, click List.
  2. In the Unscheduled scenes panel, find the scene. To narrow the panel, enter text in the search field.
  3. Do one of the following:
    • Add the scene to a day: Click the button with the day's number, such as #1.
    • Drop the scene at a specific point: Drag the scene by its handle onto a shooting day or onto an event in that day.

    The scene appears in the day as a scene-shooting event, and the day's event count and total duration update.

To add a day from the List view, click Add day. To add a blank event to a day, click Add event in the day's header.

Reorder events in a day

In the List view, do any of the following:

  • Drag an event: Drag its handle up or down. To use the keyboard, focus the handle, press Space, then use the arrow keys.
  • Move an event one step: Click Move up or Move down in the event's row.
  • Move an event to the next or previous day: Click Move to next day or Move to previous day.

Work with the stripboard

The List view is a stripboard: each scene shooting is a coloured strip with its scene number, interior or exterior, location, time of day, cast numbers, and page count. Other events, such as lunch or a company move, appear as dark bars.

Do any of the following:

  • Choose the strip colours: Click Strip colours. In Colour strips by, choose Scene type to use the board convention (for example, white for INT · day and yellow for EXT · day) or Calendar to use each event's calendar colour. To change a colour, click its swatch. Click Reset to default colours to undo your changes.
  • Set when a day starts: In the day's header, enter a time in Start. The events of the day follow on from it.
  • Time a strip from its shots: Click (Use the shots' estimate) on a strip. Its length becomes the total of its shots' shooting estimates. See Plan shots.
  • Split a scene over several strips: Click (Split into parts) on a strip, select the Shots for the new part, and confirm. Each part shows pt 1, pt 2, and so on; you can move parts to other days. To join two parts next to each other again, click (Merge with the part above).
  • Print the stripboard: Click Export PDF. The PDF shows the days and strips as you see them, with a cast list that explains the cast numbers.

Assign and lock cast numbers

You can keep the cast numbers on your strips stable as the screenplay changes. To edit them, you need permission to edit characters.

  1. On the Schedule page, choose File > Cast numbers.
  2. To change an ID, click it, enter Cast ID, then click Save. Use letters and digits, such as 1, 12 or 1A. Each ID belongs to one character.
  3. Click Assign numbers to save the proposal and lock it.

The proposal uses role size, then dialogue passages, scene count and first appearance. Locked characters keep their IDs when you add earlier scenes. New characters receive a free number; deleted characters leave a gap.

To change the numbering, click Unlock numbers or Renumber, then confirm. Unlocking keeps the saved IDs. Renumbering replaces them with a fresh proposal and locks it. Printed strips and call sheets will no longer match changed IDs.

The cast number list with character IDs and the numbering lock controls.
The cast number list with character IDs and the numbering lock controls.

Add events in the calendar

  1. On the Schedule page, click Day or Week.
  2. Drag down the time grid from the start time to the end time.
    The new event appears and its editor opens so you can set the details.

To move an event, drag it to a new time or day. To change its length, drag its top or bottom edge. Press Escape while dragging to cancel.

Dates with a shooting day show its number, such as Day 3, above the events. An event on a date without a shooting day isn't on any call sheet; its editor shows No shooting day. To add a day on that date, see Set up shooting days.

Edit an event

  1. Do one of the following:
    • In the Day, Week, or Month view: Click the event.
    • In the List view: Click Edit in the event's row.
  2. In the event editor, choose a type from the menu at the top:
    • Scene shooting: Filming a scene. Click the scene name to choose a different scene.
    • Lunch break: A break with a Location and a Menu. Enter one dish per line.
    • Company move: A move to a Destination.
    • Meeting: A meeting with a title, Link, Protocol, Location, and Description.
    • Preparation: A preparation task with a title and Description that you can mark Important.
    • Generic: Any other event, with a title and Description.
  3. Change the Date, Start, End, or Calendar as needed.
    To format a Description, select text, then make it bold, italic, or underlined, or add a link. Anyone else with the event open sees your changes as you type.
    If the end time is earlier than the start time, the event ends the next day, as for a night shoot. An event belongs to the shooting day of the date it starts on, shown next to Date, so it appears on that day's call sheet. An event on a date without a shooting day isn't on any call sheet.
  4. To add people, click Add attendee, then choose a contact.

Changes are saved as you make them.

The event editor for a scene-shooting event, showing the scene, its times and shooting day, the cast called from the script, and the planned shots.
The event editor for a scene-shooting event, showing the scene, its times and shooting day, the cast called from the script, and the planned shots.

Who a scene shooting calls

You don't add actors to a scene-shooting event yourself. The Cast section lists every character tagged in the scene with the people cast in that role, and FilmKit calls them automatically. A character nobody plays yet is marked Not cast; click the character's name to cast the role. The call sheet and the day out of days report use the same cast.

If a role isn't needed for this event, such as a voice-only part or an actor who only works on another day's part of the scene, turn off the switch next to the character. The role stays listed as Not called on this strip, and the actor is left off this event, the call sheet, and the day out of days report. Turn the switch back on to call them again.

To call someone the script doesn't name, such as a stand-in or a coordinator, click Call someone else, then choose a contact. They appear under Also called.

Plan a scene's shots

In a scene-shooting event, click Add shot to add a planned shot from the scene, then enter how many minutes it takes. Each shot shows the time it starts, based on the durations before it, and Shots shows the planned total against the event's length. Drag a shot by its handle to reorder it.

Breakdown lists the scene's set and props. Under Scene constraints, you can set the scene's Story day, Time of day, Continuity group, and Continuity order; they apply to the scene wherever it's scheduled. Under Looks, you choose what each character wears. See Track script continuity.

To copy an event, click Duplicate event . To delete it, click Delete event . Deleted events move to the project's Trash, where you can restore them. See Restore deleted items from the Trash.

Work with units

The Units menu at the top of the Schedule page shows the unit you're looking at. Choosing a unit changes only what you see; it doesn't change anything for the rest of the team.

The Units menu listing the main unit and the 2nd unit, with the New unit command.
The Units menu listing the main unit and the 2nd unit, with the New unit command.

Click the menu, then do any of the following:

  • Look at another unit's schedule: Choose the unit. The page shows that unit's active board.
  • Add a unit, such as a second unit: Choose New unit, enter a name, then click Create. The new unit starts with an empty board, which is its active board.
  • Rename a unit: Click Rename unit next to it. You can rename the main unit too.
  • Delete a unit: Click Delete unit , then click Delete unit to confirm. Its boards are archived and can't publish call sheets. You can't delete the main unit. To bring a unit back, click Restore under Deleted units, then restore its boards from the Boards menu.

Work with boards

The Boards menu next to the Units menu shows the active board of the unit you're looking at, and lists only that unit's boards.

The Boards menu listing the main unit's boards with the active board selected and the New board command.
The Boards menu listing the main unit's boards with the active board selected and the New board command.

Click the menu, then do any of the following:

  • Switch to another board: Choose the board. It becomes the unit's active board. Other units keep their active boards.
  • Create a board: Choose New board, enter a name, then click Create. The board is added to the unit you're looking at.
  • Rename a board: Click Rename board next to it.
  • Copy a board with its days and events: Click Duplicate . The copy stays in the same unit.
  • Move a board to another unit: Click Move to unit , then choose the unit. This button appears when the project has more than one unit.
  • Hide a board you don't need: Click Archive . You can't archive the active board. To bring an archived board back, click Restore under Archived.

Manage calendars

  1. On the Schedule page, choose File > Calendars….
  2. Do any of the following:
    • Add a calendar: Click New calendar, enter a name, choose a Color, then click Create.
    • Change a calendar's color: Click its color swatch, then choose a color.
    • Rename, copy, or delete a calendar: Click Rename calendar, Duplicate, or Delete next to it.

    A deleted calendar moves to the project's Trash. When you restore it, its events get the calendar back.
The Calendars dialog listing the Shooting calendar with its color, rename, duplicate, and delete controls.
The Calendars dialog listing the Shooting calendar with its color, rename, duplicate, and delete controls.

Exchange a schedule with Movie Magic

You can bring a schedule from Movie Magic Scheduling, or from an app that exports Movie Magic files such as Revision Screenwriter, into FilmKit, and hand a board back to Movie Magic. FilmKit reads and writes Movie Magic Scheduling 6 files (.msd); in Movie Magic Scheduling 10, choose File > Export MMS6 to make one.

To import a Movie Magic schedule:

  1. On the Schedule page, choose File > Import from Movie Magic…, then choose the .msd file.
  2. In the Review Movie Magic import dialog, choose the Board in the file if it has several, and enter a New board name.
  3. Check the scenes. If the project has no scenes yet, FilmKit creates a screenplay with one scene per breakdown sheet; enter its Screenplay title. Otherwise the dialog shows how many sheets match your scenes.
  4. Deselect any Breakdown elements you don't want as characters or items.
  5. Click Import.
    A new board opens with the file's shooting days, strips in their order and banners. Sheets in the boneyard stay off the board.

To give a board to Movie Magic, choose File > Export to Movie Magic (.msd). The file holds the active board's days and strips, the unscheduled scenes, and each scene's cast, extras and items in their Movie Magic categories.

The review shows the file’s Cast IDs. Import keeps those IDs and locks numbering for the project. Export writes the saved IDs.